Guides & Reference

Last updated: August 2026

Practical reference material for property teams. Asset FLOW bakes these intervals into its preventive-maintenance schedules per asset type.

Maintenance interval reference

General guidance aligned with manufacturer recommendations — always defer to the equipment manual and your service provider's contract.

Asset typeRecommended cadence
HVAC / split-type airconClean filters monthly; professional service every 3 months
Chiller / VRF systemsQuarterly inspection; full service per manufacturer schedule
Elevators (via service provider)Monthly maintenance per contract; log every visit
Fire extinguishersVisual check monthly; professional inspection annually
Emergency lights & exit signsTest monthly; battery replacement per unit schedule
GeneratorsTest run monthly; full load test and service every 6 months
Water pumps / motorsInspect quarterly; monitor for vibration and leaks
Water tanksClean and disinfect every 6 months
Plumbing & drainageVisual inspection quarterly; immediate logging of leaks
Security / CCTVCamera & recorder health check monthly

How-to guides

The Complete User Guide

What every user can do — admins, dispatchers, auditors, technicians, and tenants — with login URLs and step-by-step golden paths.

  • Getting started: register assets and print QR tags from the Tag Editor (batch A4 sheets included)
  • Technician onboarding: the 7-phase checklist covering registration, approval, linking, and first job
  • Offline apps: install to your phone's home screen and keep working through dead zones
  • Inspection readiness: export the full history of any asset in seconds from its QR profile

Walkthroughs are included during onboarding — book a demo and we'll cover the ones relevant to your property.

Common questions

Billing, setup, data privacy, and more are answered on the FAQ page.